Transition Plan for AASHTO
May 2000
APPENDIX H COST AND BENEFIT SURVEY QUESTIONAIRE
The ASR Lead Team is in the process of assessing costs / benefits of Implementation of SHRP the ASR Technologies and improvements developed in cooperation with the Lead States since conclusion of the SHRP projects. The following survey was designed to provide needed information from AASHTO members in order to make this assessment. Your cooperation in filling out this survey, or asking the appropriate personnel in your department to fill it out, would be greatly appreciated. It is understood that some of the information being requested may not be readily available or easily discernible from existing databases. In these cases your best estimate would be appreciated. Please make sure to mark these areas as "est."
The scope of this project goes beyond, and is planned to be more detailed than, the initial FHWA-sponsored study "Summary of SHRP Research and Economic Benefits of Concrete and Structures" outlined in Research Report Number 96-2 and available through the "RoadSavers" program. The data generated through this survey will be made available to all respondents.
The survey has been subdivided in two sections : 1 ) New Construction, and 2 ) Rehabilitation / Repair / Maintenance of existing ASR affected Pavements and Structures.
I. Respondent Information
Your Name _____________________________________
Your Title ______________________________________
State ______ Agency ____________________________
Department _____________________________________
| Address |
_________________________
_________________________
_________________________ |
Phone
E-Mail |
__________________
__________________ |
Do You Have Internet Access ? _ YES _ NO
Have you attended an ASR SHRP Showcase ? _ YES _ NO
I am responsible for ( Check all Appropriate Boxes ) :
| _ |
New Pavement Construction |
_ |
Materials |
| _ |
New Bridge / Structure Construction |
_ |
Specifications |
| _ |
Pavement Maintenance |
_ |
Engineering |
| _ |
Bridge Maintenance |
_ |
Contracting |
| _ |
Research |
_ |
Purchasing |
II. General
Total Lane-Miles of Highways in the State ____________________
Total Lane-Miles of Highways in Concrete ____________________
Total Number of Bridges in the State _________________
Has your state experienced concrete durability problems ? _ YES _ NO
What Percent of all structures ? _____ %
What has been identified as causes for these problems ?
| _ |
Alkali-Silica Reactivity (ASR) |
_ |
Alkali-Carbonate Reaction (ACR) |
| _ |
D-Cracking |
_ |
Freeze-Thaw |
| _ |
Sulfate Attack |
_ |
Delayed Ettringite Formation (DEF) |
| _ |
Construction Problems |
_ |
Drying Shrinkage |
| _ |
Subbase |
_ |
Other |
Have there been any "loss of service" incidents due to ASR?
_ YES _ NO _ DO NOT KNOW
If yes, please provide details : _______________________________________
_________________________________________________________________
_________________________________________________________________
If yes, what was the cost to the state? $ ________
II. New Construction
A. Pavement
How Many Lane Miles of Highway are built annually in the State ? _______
What Percent is Concrete Construction ? _________
How many Cubic Yards of Concrete are poured per year ? ________
What is the Typical Cement Content ? ______________
What is Average Material Cost for Concrete ? ______/ cu.yd.
Installed Cost ? ______ / _____
B. Bridges
How many bridges are built annually in the state ? _______
How many cubic yards of concrete are poured / year ? ________
What is the Typical Cement Content ? __________
What is Average Material Cost for Concrete ? ______/ cu.yd.
Installed Cost ? ______ / _____
C. Life-Cycle Costing
For costing purposes, do you use Life-Cycle Costing ? _ YES _ NO
If yes, what is design life for concrete pavement ? _______ years
Bridges ? _______ years
Are user costs evaluated ? _ YES _ NO
Are Construction Decisions made based on LCCA ? _ YES _ NO
D. ASR Mitigation
Do you currently test aggregate for susceptibility to ASR ? _ YES _ NO
If yes, what test procedure do you use ? _______________________________
Do you have Material Specs that address ASR ? _ YES _ NO
(If yes please attach copy).
What Mitigation Technique Does Your State Use (Check all applicable) ?
What additional cost does this add to concrete per cubic yard ?
| _ |
Low alkali cement Alkali Level _____ |
Cost : |
$ _____ / cu.yd. |
| _ |
IP Cement - Type : _____________ |
Cost : |
$ _____ / cu.yd. |
| _ |
Nonreactive Aggregate |
Cost : |
$ _____ / cu.yd. |
| _ |
Fly Ash Type : _ F _ C
Quantity : _____________ % substitution ? |
_ YES |
_ NO |
| _ |
Silica Fume Quantity : _____ % |
Cost : |
$ _____ / cu.yd. |
| _ |
GGBFS Quantity : _____ % |
Cost : |
$ _____ / cu.yd. |
| _ |
Other Pozzolan - Specify : _______________ |
Cost : |
$ _____ / cu.yd. |
| _ |
Lithium admixture |
Cost : |
$ _____ / cu.yd. |
| _ |
Other - Specify : ___________________ |
Cost : |
$ _____ / cu.yd. |
If you use mitigation, have current methods been effective ? _ YES _ NO
If NO please provide details : ______________________________________
________________________________________________________________
________________________________________________________________
If you have experienced ASR, and do not now use any mitigation, please indicate what add-on cost per cubic yard of concrete your state would recognize as cost effective to prevent on-set of ASR.
In pavement :
_ $ 0 _ $ 2 _ $ 5 _ $ 8 _ $ 10 _ $ 12 _ $ 15 _ $ 20
In bridges :
_ $ 0 _ $ 2 _ $ 5 _ $ 8 _ $ 10 _ $ 12 _ $ 15 _ $ 20
III. ASR Remediation / Repair and Maintenance
A. General
What is the state's annual expenditure for :
Maintenance / Repair of Pavement - $ ________
What portion is for ASR affected pavement ? _____ %
Maintenance / Repair of Bridges - $ _________
What portion is for ASR affected bridges ? _____ %
What method / procedures does your state use to determine remediation / repair strategies for pavement ? _________________________________
______________________________________________________________
For bridges ? __________________________________________________
_______________________________________________________________
Are user costs evaluated to determine strategies ? _ YES _ NO
What methods are used to determine if a pavement or bridge is affected by ASR ? _________________________________________________________
_______________________________________________________________
B. ASR Affected Pavement
Does your state have specific strategies for ASR Affected Pavement ?
_ YES _ NO _ DO NOT KNOW
Please rank the following side-effects of ASR in pavement in terms of relative importance in determining repair / maintenance strategies. (1-most important, 8-least important)
| ____ |
Joint failure |
| ____ |
Spalling / potholing / rutting |
| ____ |
Loss of Ride / Noise |
| ____ |
Decrease in structural strength / Modulus of Elasticity |
| ____ |
Buckling / curling |
| ____ |
Increased freeze - thaw damage |
| ____ |
Decrease of Service Life |
| ____ |
Aesthetic concerns |
How long does it take for ASR cracking to occur ? _____ yrs
What percentage of the design service life is expected to be lost due to ASR ?
_ 10 % _ 15 % _ 20 % _ 30 % _ 40 % _ 50 % _ 75 %
What Repair / Maintenance Techniques are used with ASR Affected Pavement (Choose all that apply)?
| _ |
Application of sealer - |
What type? __________________ |
| |
Duration? _____ yrs |
Cost / lane mile? $ _________ |
| _ |
Hotmix Overlay - |
Thickness? _____ in. |
| |
Duration? _____ yrs |
Cost / lane mile? $ _________ |
| _ |
Thin Whitetopping Overlay - |
Thickness? _____ in. |
| |
Duration? _____ yrs |
Cost / lane mile? $ _________ |
| _ |
Joint Repair - |
What type? __________________ |
| |
Duration? _____ yrs |
Cost / lane mile? $ _________ |
| _ |
Patching - |
What type? __________________ |
| |
Duration? _____ yrs |
Cost / lane mile? $ _________ |
| _ |
Lithium Treatment - |
What type? __________________ |
| |
Duration? _____ yrs |
Cost / lane mile? $ _________ |
| _ |
Crack repair with Methacrylate - |
What type? __________________ |
| |
Duration? _____ yrs |
Cost / lane mile? $ _________ |
| _ |
Crack Repair with Epoxy - |
What type? __________________ |
| |
Duration? _____ yrs |
Cost / lane mile? $ _________ |
| _ |
Replacement - Type _ Concrete |
_ Hotmix - Thickness? _____ in. |
| |
Duration? _____ yrs |
Cost / lane mile? $ _________ |
| _ |
Other - Please Detail ___________________________________ |
| |
_______________________________________________________ |
| |
Duration? _____ yrs |
Cost / lane mile? $ _________ |
Of the above strategies, which one has been the most effective?
_____________________________________________________
Which the least? _____________________________________
B. ASR Affected Bridges / Structures
Does your state have specific strategies for ASR Affected Bridges / Structures?
_ YES _ NO _ DO NOT KNOW
Please rank the following side-effects of ASR in bridges / structures in terms of relative importance in determining repair / maintenance strategies. (1- most important, 8-least important)
| ____ |
Deck failure |
| ____ |
Spalling / potholing / rutting |
| ____ |
Loss of Ride / Noise |
| ____ |
Decrease in structural strength / Modulus of Elasticity |
| ____ |
Increased Corrosion |
| ____ |
Increased freeze - thaw damage |
| ____ |
Decrease of Service Life |
| ____ |
Aesthetic concerns |
How long does it take for ASR cracking to occur ? _____ yrs
What percentage of the design service life is expected to be lost due to ASR ?
_ 10 % _ 15 % _ 20 % _ 30 % _ 40 % _ 50 % _ 75 %
What Repair / Maintenance Techniques are used with ASR Affected Pavement (Choose all that apply)?
| _ |
Application of sealer - |
What type? __________________ |
| |
Duration? _____ yrs |
Cost / sq.ft.? $ _________ |
| _ |
Hotmix Overlay - |
Thickness? _____ in. |
| |
Duration? _____ yrs |
Cost / sq.ft.? $ _________ |
| _ |
Thin Whitetopping Overlay - |
Thickness? _____ in. |
| |
Duration? _____ yrs |
Cost / sq.ft.? $ _________ |
| _ |
Deck Replacement - |
What type? __________________ |
| |
Duration? _____ yrs |
Cost / sq.ft.? $ _________ |
| _ |
Patching - |
What type? __________________ |
| |
Duration? _____ yrs |
Cost / sq.ft.? $ _________ |
| _ |
Lithium Treatment - |
What type? __________________ |
| |
Duration? _____ yrs |
Cost / sq.ft.? $ _________ |
| _ |
Crack repair with Methacrylate - |
What type? __________________ |
| |
Duration? _____ yrs |
Cost / sq.ft.? $ _________ |
| _ |
Crack Repair with Epoxy - |
What type? __________________ |
| |
Duration? _____ yrs |
Cost / sq.ft.? $ _________ |
| _ |
Replacement - |
Thickness? _____ in. |
| |
Duration? _____ yrs |
Cost / sq.ft.? $ _________ |
| _ |
Other - Please Detail ___________________________________ |
| |
_______________________________________________________ |
| |
Duration? _____ yrs |
Cost / sq.ft.? $ _________ |
Of the above strategies, which one has been the most effective?
_____________________________________________________
Which the least? _____________________________________
IV. Other Costs to State related to ASR
Please provide approximate annual costs to the state for the following due to ASR. If unknown please leave blank :
1. Testing, Internal : $ _______
2. Testing, Contract : $ _______
3. Inspection : $ ________
4. Engineering Surveys / Studies : $ ________
5. Consultants : $ ________
6. Corrosion : $ ________
7. Line Striping : $ ________
8. Vehicular Damage : $ ________
9. Change to noncorrosive deicers : $ ________
10. User Lawsuits : $ ________
11. User Costs : $ ________
12. Other : $ ________ Please Specify : __________________________
|